Update measure data

The Measure Update page enables you to update data for one or more Perspective, Objective, or Initiative measures, in a convenient web form.

Measure Update page example

To update measure data:

  1. In the Navigation panel, click Admin > Measures.
  2. On the Measures page, in the header, click the Update Measure Data button.

    The Measure Update page opens.

  3. Open the Filters panel: in the header menu above the navigation panel, click the Filters icon.

  4. In the Measure Filters section, from the Select Measure data to update drop-down, select the type of measure to update.

    The type of measure you select here determines the options available in the next drop-down. For example, if you select Perspective, the next drop-down will contain a list of Perspectives.

  5. To update a measure for a specific Perspective, Objective, or Initiative, in the Select a [item] drop-down, select the desired item. Otherwise, leave this field blank to update all measures for that item type.
  6. If the measure is associated with a specific entity or a department within an entity, in the Department Filters section, select the entity and then the department from the corresponding drop-downs.
  7. In the Period Filters section, select one of the following as applicable:
    • All available periods – Returns all records for all periods that have that kind of data. For example, if you are updating Objective measure data, the system returns all Objective measure records.
    • Current Period – Returns all records that have that kind of data for the current period.
    • Individual period – Select the desired period from the drop-down.
  8. Click Apply.

    The filtered measures display in the Measure Update page.

    TIP: To see the detail for a measure, click the graph icon () to the left of the measure name at the top of the Measure column. If the measure has multiple entity or department combinations, a pop-up dialog prompts you to select the entity/department to view.
    For information on viewing related drill data (if applicable), see Drill on measure details.

  9. To update a measure, click the Results field and type the value, then press Enter.
  10. When finished updating values, click Save.
  11. In the Axiom Software prompt, click OK.
  12. To ensure that the posted values update for reports that use period measure data (such as the Cost Reduction Status report), run the following utilities in the following order: